Alfacada: 2026-03-10, ___12.50____________ UTC (DOY 69)
Date & Time
10/03/26
Author
Ariane
Other participants
Iosif, (Maria, Sofie, Angelica, Qin sampling in the lagoon)
Field report
Weather: cloudy with some sunshine
To-do:
Fill ch4 water reservoir
40% full, Iosif refilled it
Clean sensors
Ariane cleaned sensors with glassex
Download met data
done
Download flux data
done
Check clocks
Datalog 5sec ahead, smartflux ok
Download phenocam images
done
Check if li7700 ca get rssi higher than 76% (scratches)
Ok
clean HMP took a while, the u screw grid had the power cable screw broken, we attached the power side to an additional 2 screw grid found in the toolbox. We finished at 2:33pm UTC. We run out of laptop battery so we did not check the HMP readings but they should be fine.